{"id":1936,"date":"2026-05-29T14:27:48","date_gmt":"2026-05-29T12:27:48","guid":{"rendered":"https:\/\/energiepark-bad-lauchstaedt.de\/2026\/05\/29\/news-from-the-construction-site-the-april-update\/"},"modified":"2026-05-29T14:27:48","modified_gmt":"2026-05-29T12:27:48","slug":"news-from-the-construction-site-the-april-update","status":"publish","type":"post","link":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/2026\/05\/29\/news-from-the-construction-site-the-april-update\/","title":{"rendered":"News from the construction site \u2013 the April update"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>Progress continued at the Bad Lauchst\u00e4dt Energy Park throughout April and May. As part of the phased commissioning, important technical tests are being carried out \u2013 with a particular focus on electrolysis.  <\/p>\n","protected":false},"author":3,"featured_media":1935,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25,1],"tags":[],"class_list":["post-1936","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-project-information","category-unkategorisiert"],"acf":[],"_links":{"self":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts\/1936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/comments?post=1936"}],"version-history":[{"count":0,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts\/1936\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/media\/1935"}],"wp:attachment":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/media?parent=1936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/categories?post=1936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/tags?post=1936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}