{"id":1302,"date":"2025-09-21T15:02:00","date_gmt":"2025-09-21T13:02:00","guid":{"rendered":"https:\/\/energiepark-bad-lauchstaedt.de\/?p=1302"},"modified":"2026-10-05T10:37:23","modified_gmt":"2026-10-05T08:37:23","slug":"news-from-the-construction-site-the-september-update","status":"publish","type":"post","link":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/2025\/09\/21\/news-from-the-construction-site-the-september-update\/","title":{"rendered":"News from the Construction Site \u2013 The September Update"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>At the Energiepark Bad Lauchst\u00e4dt, the electrolysis plant continues to take shape: Installation of the electrolyzer stacks has been underway since September \u2013 the heart of the system where green hydrogen will be generated in the future. With this, the start of production is tangibly closer. <\/p>\n","protected":false},"author":3,"featured_media":1304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-unkategorisiert"],"acf":[],"_links":{"self":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts\/1302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/comments?post=1302"}],"version-history":[{"count":1,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts\/1302\/revisions"}],"predecessor-version":[{"id":2325,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/posts\/1302\/revisions\/2325"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/media\/1304"}],"wp:attachment":[{"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/media?parent=1302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/categories?post=1302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energiepark-bad-lauchstaedt.de\/en\/wp-json\/wp\/v2\/tags?post=1302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}